
720 solar panels to be installed on Soekarno-Hatta Airport’s operation building

A total of 720 solar panels with a capacity of 241 kilowatt-peak (kWp) will be installed on the roof of the Airport Operation Control Center (AOCC) building at Soekarno Hatta Airport in Tangerang, Banten province. (atimedia from Pixabay)
Bagikan

Komentar
Berita Terkait

Indonesian pushes for additional 2,089 MW of solar power capacity
Indonesia
•
26 Sep 2020

Taman Safari Indonesia II Prigen welcomes four newly-born Sumatran tiger cubs
Indonesia
•
04 Jun 2026

Indonesian Mount Semeru spews hot clouds as far as seven kilometers
Indonesia
•
04 Dec 2022

Indonesia, Morocco ties date back to the 13th century
Indonesia
•
16 Oct 2020


Berita Terbaru

Profile – Indonesian Islamic boarding school student discovers security flaws in systems of NASA, University of Melbourne
Indonesia
•
17 Sep 2026

Suahasil Nazara Indonesia’s new finance minister, replacing Purbaya
Indonesia
•
14 Sep 2026

Indonesia’s professor: ‘Dhikr’ in Islam not merely verbal utterance, but matter of awareness and conduct
Indonesia
•
14 Sep 2026

Minister: Airports affected by Mount Anak Krakatau volcanic ash reopen
Indonesia
•
08 Sep 2026
