
720 solar panels to be installed on Soekarno-Hatta Airport’s operation building

A total of 720 solar panels with a capacity of 241 kilowatt-peak (kWp) will be installed on the roof of the Airport Operation Control Center (AOCC) building at Soekarno Hatta Airport in Tangerang, Banten province. (atimedia from Pixabay)
Bagikan

Komentar
Berita Terkait

COVID-19 – Indonesia bans 8 African countries, preventing Omicron spread
Indonesia
•
28 Nov 2021

Indonesian agency reminds people of extreme weather next week
Indonesia
•
09 Oct 2022

Indonesia invites Poland to promote collaboration in leading sectors
Indonesia
•
24 May 2023

COVID-19 – Indonesia receives health assistance from Turkey
Indonesia
•
08 Aug 2021


Berita Terbaru

Indonesia outlines strengthened worker protection regulations at Asia-Pacific forum
Indonesia
•
26 Oct 2026

Opini – Foreign Minister Tata and the Future of Multilateralism: Indonesia and the UN in a Changing World Order
Indonesia
•
24 Oct 2026

Badr MoU: Indonesia’s move to expand cooperation in defense industry with Türkiye, Qatar, Pakistan
Indonesia
•
22 Oct 2026

Muhammad used as target of mockery by U.S. president, Indonesia’s Jama’ah Muslimin issues strong protest
Indonesia
•
20 Oct 2026
